Full Displacement Piling (FDP): Higher Capacity, No Spoil
Full Displacement Piling (FDP): Higher Capacity, No Spoil

Full displacement drilling is a modified version of continuous flight auger drilling and is exclusively used for producing cast-in-place piles. The surrounding soil is only displaced and almost no drill cuttings are conveyed to the surface. Instead of a continuous auger a smooth casing is used. At the lower end the casing is fitted with a so-called displacement body.

rocedure for full displacement drilling:

1. Positioning at the drilling point

2. Auger drilling until the final depth is reached

3. Extracting the auger and pumping in concrete

4. Pressing or vibrating in the reinforcement

5. Finished pile

Displacement body

The casing is equipped with a displacement body at the lower end.

Drilling rig with fixed leader for drilling depths of more than 50 metres

With a lattice boom leader and crawler crane as carrier machine, cast-in-place piles of more than 50 metres in length can be produced

Add:NO.214 majiadian industry park baodi district tianjin china
Tel:86-22-58656460                                     

    86-22-58656461
Fax:86-22-58656461

Cell:008615222875497(for call)

Cell:008618902059907(whatsapp)
web:www.tjdrilling.com 

Email:info@tjdrilling.com
sales@tjdrilling.com

Cel:008615222875497(for call)
Cel:008618902059907 (whatsapp)

follow us on